Elevator Installation Process
From planning to completion — Here’s what to expect when you choose a Canny Residential Elevator
We make the journey simple and stress-free. Whether you are planning for a new build or retrofitting your current home, our streamlined process ensures your elevator is installed smoothly, safely, and fully compliant with New Zealand regulations.

Your Installation Timeline

01 Site Check & Consultation
Timeframe: 1 Week
We start with a free, no-obligation consultation. Our team visits your property (or reviews your plans) to assess feasibility, discuss your needs, and walk you through the best elevator options for your space.
What we do:
- Assess space and floor layout
- Check power availability
- Discuss your design and accessibility needs
- Answer any technical or consent questions
02 Custom Design & Engineering
Timeframe: 2 Weeks
Once confirmed, we customise the elevator’s specifications to suit your home — from car size and door style to finishes and lighting. We’ll also begin preparing documents for building consent.
What we finalise:
- Car design and materials
- Shaft dimensions and site fit
- Consent-ready drawings
- Lift configuration (e.g. 2-5 stops)
03 Manufacturing
Timeframe: 40 days
Your elevator is manufactured with precision at Canny’s global facility, using world-class engineering and strict quality control. All components are triple-checked before shipment.
Highlights:
- Assembled to your exact specs
- Quality-tested and packaged
Ready for fast shipping to NZ
04 Delivery & Site Prep
Timeframe: 4 Weeks
We coordinate delivery with your builder or project manager. If retrofitting, we’ll prep the site with minimal disruption. Shaft and electrical prep should be completed before installation.
Typical requirements:
- Power supply in place (230V)
- Shaft built to approved specs
- Access path for delivery
05 Installation
Timeframe: 2 Weeks
Our certified installers handle the entire setup — from placing the lift frame to configuring the control system. Most installs take 3–5 days, depending on complexity and home access.
What’s included:
- Lift frame & motor system
- Door installation
- Interior fitting and finishes
Test runs and fine-tuning
06 Handover & Compliance Sign-Off
Once installation is complete, we’ll walk you through your new elevator. A certified inspector signs-off the lift to confirm it meets all NZ Building Code requirements.
You receive:
- Final compliance certificate
- User guide & safety briefing
Ongoing service schedule
Checklist: What You’ll Need
Power Supply
A standard 230V single-phase power source is required.
Council Consent
We assist in preparing and submitting the documentation needed to meet New Zealand building consent requirements.
Shaft Dimensions
Your shaft must meet minimum internal clearance specs. We’ll guide your builder with exact drawings.
Access for Delivery
Ensure clear access for equipment delivery and installation (including adequate width for components).
Structural Support
Floors and walls around the shaft may need reinforcement, especially in retrofits. We provide detailed guidance early in the process.
NZ Building Code Compliance
Every Canny Residential Elevator is:
Installed by certified lift technicians
Signed off by a licensed building professional
Fitted with safety features like UPS backup and motion sensors
Fully compliant with AS/NZS elevator and mobility standards